Driveway Replacement 2016

driveway

The board of directors has evaluated the asphalt condition throughout the association.  The asphalt in the worst condition was identified to be between 8108 and 8808.  The driveway area will be replaced in the Spring/Summer of 2016 including complete excavation, pitch, and drainage.

Following permits, the existing asphalt will be excavated and new base installed.  It will remain this way for about a month and allowed to settle.  Following this, the new asphalt will be installed.