New Landscape Complete

new_landscape_2015

The 2015 landscape project included over 700 individual plants.

As each building is completed, the landscape crew mulched all beds.

The board is replacing an equal number of trees as those that were removed (mostly due to the emerald ash borer).

A Fall landscape walk will be scheduled to identify the last of the ash trees to be replaced as well as other desired projects for 2016.